logo

Minnesota's First Geothermal Field in a Landfill

Sector: Geothermal • Location: Minnesota, United States

Source: Waste 360

Project
Planned

Minnesota is set to install the state's first geothermal field in a landfill, marking a significant step towards sustainable energy solutions. This project aims to utilize the geothermal potential of the landfill to provide renewable energy.

Status
Prospective
Sector
Geothermal
Location
Minnesota, United States of America
Updated
22 Jul 2026
Source
Waste 360

ConstructChat

Ask ConstructChat about Minnesota's First Geothermal Field in a Landfill

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Minnesota's First Geothermal Field in a Landfill” is an infrastructure initiative in the Geothermal sector, located in Minnesota, United States. Taiyo aggregates data on it from Waste 360.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Minnesota is set to install the state's first geothermal field in a landfill, marking a significant step towards sustainable energy solutions. This project aims to utilize the geothermal potential of the landfill to provide renewable energy.

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Waste 360

URL

More Details

Record type

Project

Sector

Geothermal

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project