Minnetrista Woodland Cove Water Main Improvements
Sector: Water Supply and Storage • Location: Minnetrista, Minnesota, United States of America
Source: Dodge USA
The Work generally includes the installation of new water main, fittings, valves, appurtenances, connections to existing water mains, and surface restoration. The project consists of two segments of water main with lengths of approximately 750 feet and approximately 460 feet, each. The majority of the water main installation will be completed by horizontal directional drilling methods with open-cu
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Minnetrista, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Minnetrista Woodland Cove Water Main Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally includes the installation of new water main, fittings, valves, appurtenances, connections to existing water mains, and surface restoration. The project consists of two segments of water main with lengths of approximately 750 feet and approximately 460 feet, each. The majority of the water main installation will be completed by horizontal directional drilling methods with open-cut trench installation of connections to existing water mains. The installed water main shall be 1... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minnetrista |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
