Mint Eco Car Wash @ Blue Heron
Sector: Automotive • Location: Riviera Beach, Florida, United States of America
Source: Dodge USA
Ground up automatic car wash facility 4414 SF. Div. 2 Site Demo, E&S, excavation, grading, cut/fills, drainage, sanitary, site water, u/g electric and phone conduit, site lighting and bases, stone, signs and striping, concrete/asphalt paving, site concrete, landscaping, irrigation, dumpster enclosure, bollards, 4 Reclaim Tanks, 1 Sand/Oil Receptor Div. 3 Building Concrete Excavation, Foundation, F
- Status
- Closed
- Sector
- Automotive, Water Supply and Storage, Cement, Commercial, Oil and Gas, Power Generation (CCGT), Road, Steel, Metal, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Riviera Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mint Eco Car Wash @ Blue Heron
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ground up automatic car wash facility 4414 SF. Div. 2 Site Demo, E&S, excavation, grading, cut/fills, drainage, sanitary, site water, u/g electric and phone conduit, site lighting and bases, stone, signs and striping, concrete/asphalt paving, site concrete, landscaping, irrigation, dumpster enclosure, bollards, 4 Reclaim Tanks, 1 Sand/Oil Receptor Div. 3 Building Concrete Excavation, Foundation, Footings Div. 4 Masonry: CMU Block Walls, Stone Veneer Div. 5 Structural and Miscellaneous Steel E... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Riviera Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Cement, Commercial, Oil and Gas, Power Generation (CCGT), Road, Steel, Metal, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
