Mint Spring Bayou & VICK 310 Stabilization
Sector: Waste Processing and Treatment • Location: Vicksburg, Mississippi, United States of America
Source: Dodge
The Work includes construction of a slope stabilization system consisting of high capacity strand anchor and reinforced concrete anchor plates and placing reinforced granular fill in front of the anchor benches to stabilize the slope adjacent to Mint Spring. The project also consists of associated site work, erosion control measures and installing the wall drainage system per the site plans and sp
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Cement, Manufacturing (Industrial)
- Location
- Vicksburg, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mint Spring Bayou & VICK 310 Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes construction of a slope stabilization system consisting of high capacity strand anchor and reinforced concrete anchor plates and placing reinforced granular fill in front of the anchor benches to stabilize the slope adjacent to Mint Spring. The project also consists of associated site work, erosion control measures and installing the wall drainage system per the site plans and specifications. In addition to the Mint Springs work, this project consists of constructing approxi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Vicksburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Cement, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
