Mintia Gas-Fired Power Plant
Sector: Warehouse • Location: Romania
Source: Project Cargo Journal
A monumental logistics operation is underway in Romania, where Felbermayr is at the forefront of enabling a critical energy infrastructure project. By summer 2025, Felbermayr aims to have transported all technical components for the Mintia gas-fired power plant, a national strategic investment destined to become the largest gas-fired power plant in Europe.
- Status
- Under Construction
- Sector
- Warehouse, Power Generation (CCGT)
- Location
- Romania
- Updated
- 22 Jul 2026
- Source
- Project Cargo Journal
ConstructChat
Ask ConstructChat about Mintia Gas-Fired Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A monumental logistics operation is underway in Romania, where Felbermayr is at the forefront of enabling a critical energy infrastructure project. By summer 2025, Felbermayr aims to have transported all technical components for the Mintia gas-fired power plant, a national strategic investment destined to become the largest gas-fired power plant in Europe. |
Location
Country | Romania |
Source
Source | Project Cargo Journal |
URL |
More Details
Record type | Project |
Sector | Warehouse, Power Generation (CCGT) |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Romania
- Stada Arzneimittel Supply Chain and Packaging Facility, Turda, Romania
- WAREHOUSE LOGISTICS EXPANSION
- WAREHOUSE LOGISTICS ROMANIA
- The Southward Extension of the Lighter Berth in the Port of Constanta
- Efficient management in emergency situations in the cross-border region Calarasi-Veliko Tarnovo
- REHABILITATION OF THE RAILWAY LINE COSLARIU – SIMERIA FOR THE TRAFFIC OF THE TRAINS AT A MAXIMUM SPEED OF 160 KM/H
- Policies to develop entrepreneurship and innovative SMEs in rural areas
- Danube Inland Harbour Development
