Mir Alam Bridge Construction
Sector: Bridge • Location: Hyderabad, Telangana, India
Source: Times of India
The project involves the construction of a cable-stay bridge at Mir Alam Tank, aimed at beautifying and developing the area. The Chief Minister has directed officials to complete the project within 30 months after preparing a detailed project report in 60 days.
- Status
- Prospective
- Sector
- Bridge
- Location
- Hyderabad, Telangana, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Mir Alam Bridge Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a cable-stay bridge at Mir Alam Tank, aimed at beautifying and developing the area. The Chief Minister has directed officials to complete the project within 30 months after preparing a detailed project report in 60 days. |
Location
Country | India |
State | Telangana |
City | Hyderabad |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in India
- Kharar - Ludhiana section of NH - 95 (new NH - 05)
- NK Toll Road Limited
- Mumbai Nasik Expressway Limited
- Nardhana ROB (Railway over Bridge)
- Transstroy Bhopal Berasia Sironj Tollways Private Limited
- MBL (MP) Toll Road Company Limited
- Indore-Edelabad Road
- Soma Isolux Varanasi Aurangabad Tollway Private Limited
