logo

Mirae High School of Science & Technology Cafeteria Extension / Bare Ground Architects

Sector: Commercial

Source: ArchDaily

Project
Closed

Instead of the kitchen, we suggested placing the cafeteria in the direction of the playground. Considering that the height difference between the building and the playground is about 2 meters, we arranged stairs, a terrace, and a yard around the restaurant. We also set up a spacious eaves to cover the south-facing outdoor rest area and the movement of the building. It is cozy and naturally connect

Project Information FAQ

Project Information

3 Q
The project “Mirae High School of Science & Technology Cafeteria Extension / Bare Ground Architects” is an infrastructure initiative in the Commercial sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Instead of the kitchen, we suggested placing the cafeteria in the direction of the playground. Considering that the height difference between the building and the playground is about 2 meters, we arranged stairs, a terrace, and a yard around the restaurant. We also set up a spacious eaves to cover the south-facing outdoor rest area and the movement of the building. It is cozy and naturally connects indoors to the outdoors through transparent windows.Next, the volume of the restaurant was carefully designed. It was easy to become a stuffy space with a low ceiling because it had to be attached to an existing building and extended. Therefore, we planned a clerestory window to match the axis leading to the playground to change the ceiling height. This made the interior three-dimensional and enriched the sense of space with sufficient light and ventilation. When you enter the restaurant from the hallway, you can first see the soft light coming down. A long line of light toward the playground visually connects the restaurant with the outside space. The clerestory window with deep louvers complements the proportion of the elevation, which corresponds to the long shape of the base and eaves, and enhances the morphological completeness.Text description provided by the architects.The school was planning to expand the facilities for the cafeteria, which is underground and has poor surroundings. It would be nice to expand both the kitchen and the restaurant, but due to the limitations of the building-to-land ratio, we had to utilize some of the existing buildings. The school planned to place the restaurant in the existing building with a low ceiling height (3.3 meters) and expand the kitchen. At first glance, it sounds reasonable because the kitchen needs high ceilings for many mechanical facilities. However, what we considered important was to make it an open space where students and faculty could naturally connect with the outside space and enjoy the view of Mt. Bulamsan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data