logo
ProjectNot Applicable

Miraj Chord Line

Sector: Manufacturing (Industrial) • Location: Sangli, Maharashtra, India

Source: India Investment Grid (IIG)

Information Central Railway has come up with Miraj Chord Line with a ticket size of 128.78 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Existing Scenario 1.Trains from Londa Jn to Kolhapur or to Pandharpur have to compulsorily enter Miraj Jn, undergo Engine reversal at Miraj Jn. 2. Trains

Status
Under Construction
Sector
Manufacturing (Industrial), Residential, Rail, Mass Transit, Government
Location
Sangli, Maharashtra, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Miraj Chord Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Miraj Chord Line” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Sangli, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

not applicable

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Central Railway has come up with Miraj Chord Line with a ticket size of 128.78 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Existing Scenario 1.Trains from Londa Jn to Kolhapur or to Pandharpur have to compulsorily enter Miraj Jn, undergo Engine reversal at Miraj Jn. 2. Trains from Kolhapur to Londa Jn or to Pandharpur have to compulsorily enter Miraj Jn, undergo Engine reversal at Miraj Jn. 3. Trains from Pandharpur to Kolhapur or to Londa Jn have to compulsorily enter Miraj Jn, undergo Engine reversal at Miraj Jn This leads to Detention of these Trains at Miraj Jn and other Trains of PA MRJ as well as LN MRJ in their respective Sections. This is apart from the undesirable, infructuous and chaotic Line occupancy at Miraj Jn. The approximate Detention of Coaching trains crisscrossing Miraj Jn is 1 hour per Train while the approximate Detention time of crisscrossing Goods trains is 1.5 hrs for each Train. The necessity of Chord Lines bypassing the Miraj Jn is justified in view of the enormous losses to the Indian Railway on account of Detention to trains, loss of man-hours of the travelling public and losses to the Industries that rely on Indian Railways for efficient transportation of their Goods. The Miraj Kolhapur, Miraj Hubballi and Miraj Pandharpur Sections are proposed to be connected by a Single Line BG Electrified Chord Line for each corridor of cumulative length 1.735 kms. The proposed Chord Lines will take off from the proposed Doubling Line on the Miraj Kolhapur Section approximately 1.4 kms away from Miraj and enter the New Miraj Station at 0.9 kms.

Original sector

Railways

Budget

Location

Country

India

State

Maharashtra

City

Sangli

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Residential, Rail, Mass Transit, Government

Article published date

2025-08-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project