Miramar WTP Caustic Pumping System
Sector: Water Supply and Storage • Location: San Diego, California, United States of America
Source: Dodge USA
The completed work will provide a new sodium hydroxide (caustic) system to the front or headworks of the Miramar Water Treatment Plant providing flexibility to adjust the pH accommodating the purified water source being added to Miramar Reservoir by the Pure Water Program. This includes: a) Sodium hydroxide (caustic) pumps. b) Discharge Pipeline from the new caustic pumps routed through the existi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results, Construction Documents |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The completed work will provide a new sodium hydroxide (caustic) system to the front or headworks of the Miramar Water Treatment Plant providing flexibility to adjust the pH accommodating the purified water source being added to Miramar Reservoir by the Pure Water Program. This includes: a) Sodium hydroxide (caustic) pumps. b) Discharge Pipeline from the new caustic pumps routed through the existing concrete pipe trench with removable concrete lids, eventually terminating with a caustic surfa... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
