logo

Mirasol Solar Farm

Sector: Power Generation (CCGT) • Location: Pueblo, Colorado, United States

Source: The Colorado Sun

Project
Planned

The Mirasol Solar Farm is a 120-megawatt solar power development on 1,140 acres of trust land in Pueblo County, Colorado. It is part of a larger 200-megawatt solar project that includes adjacent private land. The project will connect to new transmission lines by Xcel Energy/Public Service, with construction starting in 2027 and grid connection expected in winter 2028. The lease is expected to gene

Status
Prospective
Sector
Power Generation (CCGT), Raw Materials, Solar
Location
Pueblo, Colorado, United States of America
Updated
22 Jul 2026
Source
The Colorado Sun

ConstructChat

Ask ConstructChat about Mirasol Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mirasol Solar Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pueblo, Colorado, United States. Taiyo aggregates data on it from The Colorado Sun.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mirasol Solar Farm is a 120-megawatt solar power development on 1,140 acres of trust land in Pueblo County, Colorado. It is part of a larger 200-megawatt solar project that includes adjacent private land. The project will connect to new transmission lines by Xcel Energy/Public Service, with construction starting in 2027 and grid connection expected in winter 2028. The lease is expected to generate over $26.3 million in fees for the Public School Trust, supporting school funding.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Pueblo

Source

Source

The Colorado Sun

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Solar

Article published date

2026-07-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project