Mirfa IWPP
Sector: Commercial • Location: United Arab Emirates
Source: Hyundai Engineering
Changing seawater into “blue gold”The Mirfa Independent Water and Power Plant was designed to generate 1,600㎿ of electricity, with a seawater desalination capacity of 238,000t per day. The United Arab Emirates has made all-out efforts to develop low-cost, high-effective water treatment technology since 2009 when the country classified highly valuable water resources, or so-called blue gold, as a n
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Changing seawater into “blue gold”The Mirfa Independent Water and Power Plant was designed to generate 1,600㎿ of electricity, with a seawater desalination capacity of 238,000t per day. The United Arab Emirates has made all-out efforts to develop low-cost, high-effective water treatment technology since 2009 when the country classified highly valuable water resources, or so-called blue gold, as a next generation growth engine.The project was finished in 2017, the new plant is account for 10 percent of Abu Dhabi’s power generation and 10 percent of drinking water supply. The desalinated water is utilized to create a green area and help transform Abu Dhabi, the country’s capital, into a “water hub.” The water is also be used to afforest the desert area. Hyundai E&C received the order worth about 990.00 million dollars from Abu Dhabi Water and Electricity Authority(ADWEA), jointly with Hyundai Engineering and Italia’s Ansaldo.The Mirfa project is all the more meaningful in that our efforts are expected to bear good fruit in the water industry which we have relentlessly worked hard on as one of four sustainable management areas since 2009. The project uses reverse osmosis, marking the first RO technology implemented by Hyundai E&C for water treatment.Seeing crisis as an opportunityThe Mirfa project aimed to build both a gas-fired power plant and a desalination facility at the same time, which is unprecedented in the power generation market. On top of this, we had to repair and improve four units of gas turbines left unused for the past decade.To meet the construction schedule despite the unfavorable conditions, we provided a temporary accommodation as well as the camp for workers in order to operate and manage the construction site around the clock.Amid poor weather conditions such as heat wave above 50 degrees Celsius and strong sandstorms, the Mirfa construction site could curtail the construction period at once by developing its own system.Safety-related employees train outsourced workers from all over the world with materials written in different languages every morning. Hyundai E&C thoroughly complied with the well-planned safety penalty and reward system to make Hyundai E&C's safety culture take root. As a result, the construction site achieved 20 million hours of zero accident last month.The Mirfa combined cycle power desalination plant project broke through a lot of difficulties. And now it is providing a new model in the Middle East. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United Arab Emirates
- Al Dhafra Solar Project Abu Dhabi
- Gulf Pharmaceutical Industries (Julphar) Insulin Production Facility
- Neopharma Pharmaceutical Plant, Abu Dhabi, UAE
- 375 MLD Jebel Ali Sewage Treatment Plant
- Jebel Ali Refinery Expansion Project
- NFPC’s Food Production Facility, Abu Dhabi
- UAE Nuclear Power Plant Unit 1~4
- Habshan-5 Utilities & Offsites
