Mirny WPP and BESS Project
Active · Kazakhstan
Source: European Bank for Reconstruction and Development (EBRD)
A senior secured loan on a non-recourse basis in favour of Aktas Energy LLP, which will be owned by TotalEnergies Renewables (60%, subsidiary of TotalEnergies), KMG Green Energy LLP (20%, subsidiary of NC KazMunayGas JSC) and Qazaq Green Power PLC (20%, subsidiary of Samruk-Energy JSC), to finance the development, construction, commissioning, operation and maintenance of an onshore wind power plan
- Status
- Prospective
- Sector
- Energy Storage, Road, Power Generation (CCGT), Commercial, Wind, Residential, Government
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Mirny WPP and BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A senior secured loan on a non-recourse basis in favour of Aktas Energy LLP, which will be owned by TotalEnergies Renewables (60%, subsidiary of TotalEnergies), KMG Green Energy LLP (20%, subsidiary of NC KazMunayGas JSC) and Qazaq Green Power PLC (20%, subsidiary of Samruk-Energy JSC), to finance the development, construction, commissioning, operation and maintenance of an onshore wind power plant with a total capacity of 1,000 MW, using a 300 MW / 600MWh battery energy storage system near the village of Mirny, in the Zhambyl region in Kazakhstan. This is a landmark project for Kazakhstan as it introduces a sizeable 600 MWh of BESS capacity, which balance the grid to mitigate the intermittency of renewables. The Project includes construction of transmission infrastructure required for evacuation of generated renewable energy- three 500 kV overhead transmission lines of 231km length and upgrade of the existing 500 kV Shu and Yukgress substations. The Project is expected to result in significant environmental benefits through introduction of 1 GW of new wind renewable energy capacity corresponding to yearly reduction of 2.48 million tonnes of CO2 emissions. All documents are in English and Russian language. NTS, SEP, LARF, ESMS, BMP, ATMF and ESAP are additionally in Kazakh language. Download Zip package in English Download Zip package in Russian Download Zip package in Kazakh Full ESIA documentation is available: Locally at: Akimat in Ulken, Contact person: Nadira, tel: +7 777 527 21 79. Address: Алматинская область, п.Улькен, 1 мкр., 2 дом/Almaty region, village Ulken, 1 microregion, 2nd house. Akimat in Moyinkum. Contact person: Kazakbauily Nurkeldy, tel: 8 (726 42) 2 43 99. Address: Жамбылская область, Мойынкумский район, с. Мойынкум, ул. Карбышева, дом 2 Жамбылская область/Zhambyl region, Moyyinkum rayon, 2, Karbysheva str. Akimat in Mirny, Contact person: Indira Omanova, tel: +7 702 245 12 18. Address: Мойынкумский район, с. Мирный, ул. Абылайхана, дом 7/Moiynlum region, village Mirny, 7, Abylaihana str. Administrative building, Shu City, Contact person: Zhandos Kurbanbayev, tel: +7 701 985 41 80. Address: Жамбылская область, Шуйский район, г. Шу, ул. К.Сатпаева, дом 147 /Zhambyl region, Chu rayon, 147, Saptaeva str. And Aktas Energy LLP Address: BC “Q”, Block A, 7th floor, 15a Kabanbay Batyr avenue, Astana, 010000, Kazakhstan. Email: grievances.mirny@totalenergies.com The Project website (www. mirny.kz) And EBRD Resident Office in Astana, Kazakhstan Address: Talan Towers offices BC, 16, Dostyk street, 23rd floor, Astana, Z05H9K3, Kazakhstan. Telephone: +7 7172 554246 Email: EbrdAstanaInfo@ebrd.com Environmental or social enquiries Name: Tetiana Voitovych, Email: tetiana.voitovych@totalenergies.com Website: www. mirny.kz |
Original sector | Energy |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Road, Power Generation (CCGT), Commercial, Wind, Residential, Government |
Article published date | 2026-01-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project