Misc Dev - American Addition Infrastructure Phase 4
Closed · Ohio · Last reported Dec 2023
Source: Dodge USA
This project consists of the reconstruction of 4 streets and 3 alleys of the American Addition Subdivision. All streets shall include new sidewalks, landscaping, storm sewer, water line, sanitary sewer service stubs, street lighting, and traffic control devices. The project will replace select lighting luminaires and apply an asphalt rejuvenation agent to the asphalt roadway on other streets withi
- Status
- Closed
- Sector
- Broadband, Water Supply and Storage, Car parking, Road, Telecommunications, Waste Processing and Treatment, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Misc Dev - American Addition Infrastructure Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the reconstruction of 4 streets and 3 alleys of the American Addition Subdivision. All streets shall include new sidewalks, landscaping, storm sewer, water line, sanitary sewer service stubs, street lighting, and traffic control devices. The project will replace select lighting luminaires and apply an asphalt rejuvenation agent to the asphalt roadway on other streets within the subdivision. The project includes preparing and installing a new single mode fiber optic ca... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Water Supply and Storage, Car parking, Road, Telecommunications, Waste Processing and Treatment, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
