Miscellaneous Reservoir and Pump Station Improvements, City Project No. 84200
Sector: Airport • Location: Burlingame, California, United States of America
Source: City of Burlingame
City Project No. 84200 This project constructed a new motor control center and also removed soil from the top of the Hillside reservoir. A reliable SCADA system will improve the water quality to the community. This project also included the installation of a new treatment plant wash pad. The new wash pad will improve public safety by removing the vacuum truck washing run-off from the public street
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | City Project No. 84200 This project constructed a new motor control center and also removed soil from the top of the Hillside reservoir. A reliable SCADA system will improve the water quality to the community. This project also included the installation of a new treatment plant wash pad. The new wash pad will improve public safety by removing the vacuum truck washing run-off from the public street. The new wash pad will reduce storm water pollution by sending the vacuum truck washing run-off to the treatment plant. Scope : The work consisted of installing a new Pump Station Control House with associated electrical equipment and site improvements - removal of an existing wood retaining wall and installation of a new concrete retaining wall, new asphalt concrete pathways, removal of an existing pump control house and construction of a new Pump control house with concrete block walls on a concrete foundation and relocation, reconnection and test all the electrical, control and instrumentation equipment, and traffic control at Hillside Reservoir on 2832 Hillside Drive in the City of Burlingame; and installation of a City-furnished Wash Pad electrolier on a new concrete foundation, underground conduit and wire, light switch and connections to the existing 277/ 480V electric service cabinet at the Waste Water Treatment Plant on 1103 Airport Blvd in the City of Burlingame. Plan Holders List Bid Summary |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
