Miscellaneous Wastewater System Construction - WWTP Imp
Sector: Power Generation (CCGT) • Location: Century, Florida, United States of America
Source: Dodge USA
The project consists of:A. Replace the Motor Control Center.B. Replacement of an existing Sludge Belt Press with a new Sludge Screw Press.C. Replace pumps, aerators, piping and controls within the equalization basin.D. Repair the Tertiary Filter 1 Replace filter media.2 Replace backwash pumps and electrical components and relocate outside of pit.3 Construct catwalk between the filters to provide a
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Century, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Miscellaneous Wastewater System Construction - WWTP Imp
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of:A. Replace the Motor Control Center.B. Replacement of an existing Sludge Belt Press with a new Sludge Screw Press.C. Replace pumps, aerators, piping and controls within the equalization basin.D. Repair the Tertiary Filter 1 Replace filter media.2 Replace backwash pumps and electrical components and relocate outside of pit.3 Construct catwalk between the filters to provide access for disinfection, cleaning and general maintenance.E. Repair cracks within the plant tankag... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Century |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
