logo
ProjectClosed

Misicuni Renewable Energy Hydroelectric Project

One of 2,358 projects Taiyo tracks in Bolivia.

Source: Inter-American Development Bank (IADB)

The objective of the Misicuni Multiple Project (MMP) is to supply drinking and irrigation water to the Cochabamba Valley, while generating electricity for the National Interconnected Syste,, using water from the Misicuni River watershed. The specific objective of the Misicuni Renewable Energy Hydroelectric Project (MHP), which is part of the MMP, is to add 80 MW of installed power generation capac

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Natural Gas, Hydro, Government
Location
Bolivia
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Misicuni Renewable Energy Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Misicuni Renewable Energy Hydroelectric Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bolivia. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Misicuni Multiple Project (MMP) is to supply drinking and irrigation water to the Cochabamba Valley, while generating electricity for the National Interconnected Syste,, using water from the Misicuni River watershed. The specific objective of the Misicuni Renewable Energy Hydroelectric Project (MHP), which is part of the MMP, is to add 80 MW of installed power generation capacity to the NIS and produce 217 GWh of electricity annually. The IDB will provide financing for the MHP, which will help: (i) expand the installed power generation capacity of the NIS to meet the growing need for electricity, especially during peak-demand hours; (ii) improve the energy matrix by increasing the share of renewable energy; and (iii) reduce subsidies to the sector and free up natural gas for export. The project has two components, one for the infrastructure works and the other to cover engineering, supervision, environmental and social mitigation, and other indirect costs.

Original sector

ENERGY

Budget

Location

Country

Bolivia

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Natural Gas, Hydro, Government

Article published date

2025-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project