Misicuni Renewable Energy Hydroelectric Project
One of 2,358 projects Taiyo tracks in Bolivia.
Source: Inter-American Development Bank (IADB)
The objective of the Misicuni Multiple Project (MMP) is to supply drinking and irrigation water to the Cochabamba Valley, while generating electricity for the National Interconnected Syste,, using water from the Misicuni River watershed. The specific objective of the Misicuni Renewable Energy Hydroelectric Project (MHP), which is part of the MMP, is to add 80 MW of installed power generation capac
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Natural Gas, Hydro, Government
- Location
- Bolivia
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about Misicuni Renewable Energy Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Misicuni Multiple Project (MMP) is to supply drinking and irrigation water to the Cochabamba Valley, while generating electricity for the National Interconnected Syste,, using water from the Misicuni River watershed. The specific objective of the Misicuni Renewable Energy Hydroelectric Project (MHP), which is part of the MMP, is to add 80 MW of installed power generation capacity to the NIS and produce 217 GWh of electricity annually. The IDB will provide financing for the MHP, which will help: (i) expand the installed power generation capacity of the NIS to meet the growing need for electricity, especially during peak-demand hours; (ii) improve the energy matrix by increasing the share of renewable energy; and (iii) reduce subsidies to the sector and free up natural gas for export. The project has two components, one for the infrastructure works and the other to cover engineering, supervision, environmental and social mitigation, and other indirect costs. |
Original sector | ENERGY |
Budget |
Location
Country | Bolivia |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Natural Gas, Hydro, Government |
Article published date | 2025-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bolivia
- Cochabamba Water and Sewer System
- Incahuasi Gas and Condensate Field
- Aguas del Illimani SA
- BOLIVIA MI AGUA WATER AND SANITATION
- Hidroelectrica Boliviana (Central Taquesi)
- National Irrigation Program with a Watershed Approach
- Small Population Drinking Water
- Local Strengthening for Ecosan Facilities Use in Bolivia
