logo
ProjectUnder Review

MISO Expedited Resource Addition Study Cycle 2

Sector: Power Transmission • Location: United States

Source: Utility Dive

The Midcontinent Independent System Operator (MISO) is reviewing about 6.1 GW of potential projects in its fast-track interconnection review process's second cycle, with 70% of the capacity being gas-fired generation. The total capacity under review in this cycle is about 11.2 GW. The Expedited Resource Addition Study (ERAS) process aims to bring power supplies online quickly to meet near-term gri

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT)
Location
United States of America
Updated
22 Jul 2026
Source
Utility Dive

ConstructChat

Ask ConstructChat about MISO Expedited Resource Addition Study Cycle 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “MISO Expedited Resource Addition Study Cycle 2” is an infrastructure initiative in the Power Transmission sector, located in United States. Taiyo aggregates data on it from Utility Dive.

Participants

Not available for this record.

Status

Original status

under review

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Midcontinent Independent System Operator (MISO) is reviewing about 6.1 GW of potential projects in its fast-track interconnection review process's second cycle, with 70% of the capacity being gas-fired generation. The total capacity under review in this cycle is about 11.2 GW. The Expedited Resource Addition Study (ERAS) process aims to bring power supplies online quickly to meet near-term grid needs, allowing eligible planned resources to bypass the standard interconnection queue reviews.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

Utility Dive

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2025-12-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project