MISO Expedited Resource Addition Study Cycle 2
Sector: Power Transmission • Location: United States
Source: Utility Dive
The Midcontinent Independent System Operator (MISO) is reviewing about 6.1 GW of potential projects in its fast-track interconnection review process's second cycle, with 70% of the capacity being gas-fired generation. The total capacity under review in this cycle is about 11.2 GW. The Expedited Resource Addition Study (ERAS) process aims to bring power supplies online quickly to meet near-term gri
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Utility Dive
ConstructChat
Ask ConstructChat about MISO Expedited Resource Addition Study Cycle 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under review |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Midcontinent Independent System Operator (MISO) is reviewing about 6.1 GW of potential projects in its fast-track interconnection review process's second cycle, with 70% of the capacity being gas-fired generation. The total capacity under review in this cycle is about 11.2 GW. The Expedited Resource Addition Study (ERAS) process aims to bring power supplies online quickly to meet near-term grid needs, allowing eligible planned resources to bypass the standard interconnection queue reviews. |
Original sector | Energy |
Location
Country | United States of America (USA) |
Source
Source | Utility Dive |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Jacksonville LNG Project, Jacksonville, Florida
- Gill Ranch Gas Storage Project, California
- Ashland Refinery Expansion, Garyville, Louisiana
- Baytown Refinery Coker Facility, TX
- South Lander Street Bridge Project, Seattle, US
- US 281 North Expansion Project, San Antonio, Texas, US
