logo
ProjectRejected

MISO Expedited Resource Addition Study (ERAS) Process

Rejected · United States · Last reported May 2025

Source: Utility Dive

The Midcontinent Independent System Operator (MISO) proposed the Expedited Resource Addition Study (ERAS) process to accelerate the study and interconnection of new generation projects to address urgent resource adequacy and reliability needs. The process would study projects serially each quarter and grant expedited interconnection agreements within 90 days. However, the proposal lacked limits on

Status
Failure
Sector
Power Transmission, Power Generation (CCGT)
Location
United States of America
Updated
22 Jul 2026
Source
Utility Dive

ConstructChat

Ask ConstructChat about MISO Expedited Resource Addition Study (ERAS) Process

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “MISO Expedited Resource Addition Study (ERAS) Process” is an infrastructure initiative in the Power Transmission sector, located in United States. Taiyo aggregates data on it from Utility Dive.

Participants

Not available for this record.

Status

Original status

Rejected

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Midcontinent Independent System Operator (MISO) proposed the Expedited Resource Addition Study (ERAS) process to accelerate the study and interconnection of new generation projects to address urgent resource adequacy and reliability needs. The process would study projects serially each quarter and grant expedited interconnection agreements within 90 days. However, the proposal lacked limits on the number of projects eligible to enter the ERAS queue, potentially causing lengthy processing times.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

Utility Dive

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2025-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project