MISO Expedited Resource Addition Study (ERAS)
Rejected by ferc · United States · Last reported May 2025
Source: K&L Gates
MISO's ERAS is an expedited interconnection study process for high-priority generation projects, allowing projects to be selected by Relevant Electric Retail Regulatory Authorities and studied serially. The process runs separately from the general interconnection process and accepts applications quarterly until December 31, 2028, or the completion of the 2027 study cycle. The initial proposal was
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- K&L Gates
ConstructChat
Ask ConstructChat about MISO Expedited Resource Addition Study (ERAS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | rejected by ferc |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MISO's ERAS is an expedited interconnection study process for high-priority generation projects, allowing projects to be selected by Relevant Electric Retail Regulatory Authorities and studied serially. The process runs separately from the general interconnection process and accepts applications quarterly until December 31, 2028, or the completion of the 2027 study cycle. The initial proposal was rejected by FERC but may be revised and refiled. |
Original sector | Energy |
Location
Country | United States of America (USA) |
Source
Source | K&L Gates |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Midcontinent Express Pipeline (MEP), Oklahoma
- Jacksonville LNG Project, Jacksonville, Florida
