logo
ProjectBid Results

Mispah Parking Lot Replacement

Bid results · Florida · Last reported Nov 2024

Source: Dodge USA

Current Parking Lot(s) 3.1.1. The existing parking area has significant cracks and deficiencies. 3.1.2. The existing parking lot consists of concrete but will be replaced with asphalt. 3.1.3. The existing parking lot will be demolished and replaced. 3.1.4. The parking lot does not contain any underground utilities or lighting that will be affected by this project. 3.2. Preparation 3.2.1. The Contr

Status
Closed
Sector
Cement, Government, Commercial, Car parking, Power Transmission, Road, Power Generation (CCGT), Automotive
Location
Leesburg, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Mispah Parking Lot Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mispah Parking Lot Replacement” is an infrastructure initiative in the Cement sector, located in Leesburg, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Current Parking Lot(s) 3.1.1. The existing parking area has significant cracks and deficiencies. 3.1.2. The existing parking lot consists of concrete but will be replaced with asphalt. 3.1.3. The existing parking lot will be demolished and replaced. 3.1.4. The parking lot does not contain any underground utilities or lighting that will be affected by this project. 3.2. Preparation 3.2.1. The Contractor shall assess all points of the existing parking lot. 3.2.2. Demolish and remove all existin...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Leesburg

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Government, Commercial, Car parking, Power Transmission, Road, Power Generation (CCGT), Automotive

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project