logo

Miss. 28 Bridge Rehabilitation

Under construction · Mississippi · Last reported May 2025

Source: Construction Equipment Guide

Project
Under Construction

The Miss. 28 bridge over the Pearl River is undergoing rehabilitation after being closed due to significant structural damage from an over-height vehicle. The project includes erecting structural members and repairing sway bracings to restore the bridge's integrity.

Status
Under Construction
Sector
Road, Bridge, Government
Location
Mississippi, United States of America
Updated
22 Jul 2026
Source
Construction Equipment Guide

ConstructChat

Ask ConstructChat about Miss. 28 Bridge Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Miss. 28 Bridge Rehabilitation” is an infrastructure initiative in the Road sector, located in Mississippi, United States. Taiyo aggregates data on it from Construction Equipment Guide.

Participants

Sponsoring Agency

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Miss. 28 bridge over the Pearl River is undergoing rehabilitation after being closed due to significant structural damage from an over-height vehicle. The project includes erecting structural members and repairing sway bracings to restore the bridge's integrity.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Mississippi

Source

Source

Construction Equipment Guide

URL

More Details

Record type

Project

Sector

Road, Bridge, Government

Article published date

2025-05-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project