Mission / Geneva Safety Project
Sector: Car parking • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Mission / Geneva Safety Project Share this: Facebook Twitter LinkedIn SFMTA.com/MissionGeneva Project Introduction The Mission / Geneva Safety Project is now under construction. For the most up-to-date information on the construction schedule and activities, please visit Public Works' project page and sign up for construction updates . The Mission / Geneva Safety Project is a community project foc
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | implementation / construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Mission / Geneva Safety Project Share this: Facebook Twitter LinkedIn SFMTA.com/MissionGeneva Project Introduction The Mission / Geneva Safety Project is now under construction. For the most up-to-date information on the construction schedule and activities, please visit Public Works' project page and sign up for construction updates . The Mission / Geneva Safety Project is a community project focused on pedestrian safety, Muni reliability, and loading improvements in the business district of the Excelsior neighborhood. Through near-term and long-term improvements, the project will make it safer and more pleasant to walk, shop, and live along Mission Street from Trumbull Street to Geneva Avenue and along Geneva Avenue from Mission Street to Prague Street. View the conceptual design for the Mission Street and Geneva corridors approved by the SFMTA Board of Directors in September 2019. Project Status The SFMTA Board of Directors approved the project in September 2019. SFMTA installed near-term quick-build improvements in summer 2020 to deliver important safety and transit upgrades in advance of the larger capital project, including: 'Painted safety zones' to improve visibility at corners (where concrete bulb-outs will later be added) Curb management changes to support access for local businesses Transit stop adjustments to improve Muni reliability Design for the larger capital project is nearing completion by Public Works , which includes engineering for corner sidewalk extensions, new/upgraded signals, roadway striping, and associated changes. Construction of these changes is expected to begin in summer 2022 and continue through 2025. To minimize future impacts to the community, construction is being coordinated with targeted SFPUC utility replacement work and will be followed by repaving Mission Street and Geneva Avenue. Project Timeline 2017 - 2019 Planning & Outreach Completed Spring - Fall 2019 Environmental & Legislation Completed Summer 2020 Quick-Build Implementation Completed 2020 - 2021 Detailed Design Completed Fall 2022 - Early 2026 Full Project Construction Pending Current Phase or Stage Construction Predicted Completion Early 2026 Project Status Legislated Implementation / Construction Project Success On budget On schedule Improvements Bulb-outs, traffic signals, new pedestrian crossings Transit bulbs, transit stop optimizations Loading and color curb management Bus Routes and Rail Lines 8 Bayshore 14 Mission 14R Mission Rapid 14X Mission Express (Suspended) 43 Masonic 49 Van Ness/Mission 52 Excelsior 54 Felton Neighborhoods Excelsior Outer Mission Crocker Amazon Visitacion Valley PROJECT BACKGROUND AND GOALS Mission Street and Geneva Avenue are part of San Francisco's Vision Zero High Injury Network – the 13% of city streets where 75% of the severe and fatal collisions occur. Over seven years, five community members were killed, and at least 323 people were injured in crashes in the project area. Additionally, on some blocks of the project corridor, the eight Muni lines that serve the neighborhood have average speeds below five mph. The project will address these issues while making loading improvements to support the over 300 existing storefronts along Mission and Geneva streets. The project's goals are to: Increase safety for all users of the corridor, especially people who walk, bike, and take transit Improve transit reliability on the most used bus routes in the neighborhood Enhance the business district with loading improvements OUTREACH From late 2017 to 2018, the project team conducted outreach to understand better the issues and problems the community faces when using Mission Street and Geneva Ave. Outreach included: One-on-one meetings with more than 15 community groups Door-to-door loading surveying to 175+ businesses Participation in four Excelsior and Outer Mission Neighborhood Strategy meetings Two Sunday Streets events Neighborhood walkthroughs Project staff used the results of these feedback efforts and collected data to develop a conceptual plan for Mission Street and Geneva Ave. In late 2018 and early 2019, the SFMTA hosted a series of workshops with project stakeholders to refine better the conceptual plan to reflect the community's needs. Notes from those workshops can be found under 'Reports and Documents'. The proposed project design incorporates feedback and suggestions we received from stakeholders representing various groups within the community throughout the three workshops. In April 2019, the project team hosted two open houses to present the refined designs to the broader community and collect feedback to create the final proposal. PROJECT ELEMENTS Major project elements developed through data analysis and outreach include: New traffic signals, including new signalized pedestrian crossings Traffic signal timing improvements and pedestrian 'head-starts' Corner bulb-outs Transit bulbs and islands Transit stop improvements and changes Bike lane connectivity upgrades (on Geneva Avenue) Loading and curb management improvements PROJECT TIMELINE Fall 2018 - 2019: Outreach, planning, and refinement of the proposed design April 2019: Community open houses Spring 2019: Environmental review Fall 2019: Improvements approved by SFMTA Board Summer 2020: Quick-build implementation ( painted safety zones , curb management changes) 2020 - 2021: Detailed design Fall 2022 - early 2026: Full project construction (sidewalk and signal work) RELATED PROJECTS Excelsior & Outer Mission Neighborhood Strategy Excelsior Neighborhood Traffic Calming Project Geneva - San Jose Intersersection Study Contact Information Mark Dreger Mark.Dreger@sfmta.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
