Mission Main Canal Construction
Sector: Water Supply and Storage • Location: Mission, Texas, United States of America
Source: Dodge USA
The work to be performed under the provisions of these contract documents consists of furnishing materials, equipment, labor, delivery and coordination needed to prepare for and apply shotcrete in accordance with the specifications for the lining of the Mission Main Canal, as shown on the attached Location Map. The Contractor shall coordinate construction and the delivery of equipment and material
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Mission, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mission Main Canal Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed under the provisions of these contract documents consists of furnishing materials, equipment, labor, delivery and coordination needed to prepare for and apply shotcrete in accordance with the specifications for the lining of the Mission Main Canal, as shown on the attached Location Map. The Contractor shall coordinate construction and the delivery of equipment and materials with the person designated by the Owner. the Construction of the Lining of the Mission Main Can... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Mission |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
