Mission Traction Power Improvement Project
Sector: Cable car • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Mission Traction Power Improvement Project Share this: Facebook Twitter LinkedIn SFMTA.com/MissionTraction Project Introduction Starting in late summer 2023, the San Francisco Municipal Transportation Agency (SFMTA) will begin an underground cable upgrade project on Mission Street that will make the traction power system more reliable, robust and safer. The Mission Traction Power Improvement Proje
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Mission Traction Power Improvement Project Share this: Facebook Twitter LinkedIn SFMTA.com/MissionTraction Project Introduction Starting in late summer 2023, the San Francisco Municipal Transportation Agency (SFMTA) will begin an underground cable upgrade project on Mission Street that will make the traction power system more reliable, robust and safer. The Mission Traction Power Improvement Project aims to improve the 14 Mission and 14R Mission trolley services, including other Muni trolley lines on lower Mission and Market streets, and at Salesforce Transbay Transit Center. Project Timeline Detail Design Completed March 2021 Pending Prep & Advertise March - October 2022 Pending Bid & Award October - November 2022 Pending Construction Late Summer 2023 - Summer 2024 Pending Bus Routes and Rail Lines 14 Mission 14R Mission Rapid 14X Mission Express (Suspended) Streets Mission Street Project Details, History or Features The eight-month construction will include trenching in the middle of Mission Street from Anthony Street to between 4th and 5th streets, upgrading underground cables and feeder circuits. We are also taking advantage of the construction window to upgrade six curb ramps to meet ADA (Americans with Disabilities Act) requirements. To minimize construction impacts to local businesses, neighbors and street users, all civil work that may create construction noise, including trenching, roadway restoration and ADA ramp upgrading, will be done during daytime hours. The electrical work that entails pulling cables through the manholes will be done at night from 9 p.m. to 7 a.m., Monday through Friday and until 8 a.m. on weekends . Measures will be taken to mitigate construction impacts: Muni bus service on Mission or across Mission will not be impacted, although bus stops in the construction zone may be temporarily relocated. Street will remain open to traffic during construction. At least one traffic lane will be open in each direction on Mission Street. Traffic control will be in place during the day to ease traffic. Sidewalks and bike lanes will not be closed, but pedestrians and cyclists should use caution traveling through the construction area. Loading zones (yellow and white) next to construction work may be temporarily inaccessible. To schedule a delivery, contact contractor’s foreman. City policies on spare space to accommodate construction do not apply since there are no such structures being built within construction limits. Parking may be temporarily unavailable in or near the construction zone. Materials and equipment will be staged with barricades in the middle of Mission Street with no impacts to traffic. Cable replacement work at night will create no noise disruption. Construction timeline: Notice to Proceed – August 2023 Start of Construction – September 2023 Substantial Completion – Summer 2024 Construction Contract Closeout – Fall 2024 Thank you for your support and understanding while we work hard to improve Muni system. Contact Information Mission Traction Power Improvement Project MissionTraction@SFMTA.com 415.646.2255 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
