Mississippi Drive Area Street & Utility
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 60,000 S Y Full Depth Reclamation 8,600 L F Remove and Replace Concrete Curb and Gutter 5,400 C Y Excavation - Common (P) 260 C Y Excavation - Subgrade 260 C Y Select Granular Embankment 130 C Y Aggregate Base (CV) Class 5 (P) 500 S F 6" Concrete Walk 6,80
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Government, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Champlin, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mississippi Drive Area Street & Utility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 60,000 S Y Full Depth Reclamation 8,600 L F Remove and Replace Concrete Curb and Gutter 5,400 C Y Excavation - Common (P) 260 C Y Excavation - Subgrade 260 C Y Select Granular Embankment 130 C Y Aggregate Base (CV) Class 5 (P) 500 S F 6" Concrete Walk 6,800 TON Type SP 12.5 Wearing Course Mix (2,C) 8,500 TON Type SP 12.5 Non Wear Course Mix (2,C) 350 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Champlin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Government, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
