Mississippi River Bridge at Lansing Demolition and Replacement
Sector: Bridge • Location: Lansing, Iowa/Wisconsin, United States
Source: Construction & Demolition Recycling
The Mississippi River Bridge at Lansing is scheduled for demolition on December 18, 2025, to allow for the construction of a new bridge planned to open in 2027. The demolition involves an implosion and removal of the main section, followed by debris clearance from the Mississippi River. The existing bridge has been closed to traffic since October 2025.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned for demolition |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Mississippi River Bridge at Lansing is scheduled for demolition on December 18, 2025, to allow for the construction of a new bridge planned to open in 2027. The demolition involves an implosion and removal of the main section, followed by debris clearance from the Mississippi River. The existing bridge has been closed to traffic since October 2025. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
