Mississippi River Levee Enlargement REBID MATOC MATOC
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
performing large levee enlargements on the Mississippi River Levee Project. Contractors will be required to furnish all plant, labor, materials, and equipment for performing construction of compacted, semi-compacted, and uncompacted embankments for levee and berm construction utilizing Government furnished riverside or landside borrow areas and installation of relief wells along the toe of the lev
- Status
- Closed
- Sector
- Power Transmission, Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Vicksburg, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mississippi River Levee Enlargement REBID MATOC MATOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | performing large levee enlargements on the Mississippi River Levee Project. Contractors will be required to furnish all plant, labor, materials, and equipment for performing construction of compacted, semi-compacted, and uncompacted embankments for levee and berm construction utilizing Government furnished riverside or landside borrow areas and installation of relief wells along the toe of the levee. This work will be performed primarily along the Mississippi River levee system within the geo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Vicksburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
