Mississippi River Lock and Dam Infrastructure Upgrade
Sector: Hydro • Location: Hastings and Welch, Minnesota, United States
Source: DredgeWire
The U.S. Army Corps of Engineers, St. Paul District, awarded a contract to upgrade lock and dam infrastructure on the Mississippi River. The project includes updating the traveling kevels at Lock and Dam 2 in Hastings, Minnesota, and Lock and Dam 3 near Welch, Minnesota, which support tow boats navigating upstream during lockage.
- Status
- Closed
- Sector
- Hydro
- Location
- Hastings and Welch, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- DredgeWire
ConstructChat
Ask ConstructChat about Mississippi River Lock and Dam Infrastructure Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Army Corps of Engineers, St. Paul District, awarded a contract to upgrade lock and dam infrastructure on the Mississippi River. The project includes updating the traveling kevels at Lock and Dam 2 in Hastings, Minnesota, and Lock and Dam 3 near Welch, Minnesota, which support tow boats navigating upstream during lockage. |
Original sector | Waterborne Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Hastings and Welch |
Source
Source | DredgeWire |
URL |
More Details
Record type | Project |
Sector | Hydro |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
