Missouri Route 124 Culvert Replacement and Resurfacing Project
Sector: Road • Location: Missouri, United States
Source: KMMO
This project involves the replacement of culverts on Missouri Route 124 in multiple locations to prepare the roadway for resurfacing. The project also includes resurfacing Route 124 from Fayette to Hallsville as part of a multi-route contract.
- Status
- Closed
- Sector
- Road
- Location
- Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- KMMO
ConstructChat
Ask ConstructChat about Missouri Route 124 Culvert Replacement and Resurfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the replacement of culverts on Missouri Route 124 in multiple locations to prepare the roadway for resurfacing. The project also includes resurfacing Route 124 from Fayette to Hallsville as part of a multi-route contract. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | KMMO |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
