Mitchell ES Playground
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
THIS PROJECT CONSISTS OF: - DEMOLITION OF (E) PLAYGROUND EQUIPMENT & PLAYGROUND FLOORING MATERIAL - (N) PLAYGROUND - (N) PLAYGROUND EQUIPMENT - (N) 30' x 40' x 12'H SHADE STRUCTURE; RIDGE HEIGHT: 18' - SEISMIC DESIGN CATEGORY: D / Ss = 1.814, SDS = 2/3 Fa SS = 1.451 2.0 - WIND EXPOSURE CATEGORY: C / V = 101mph, Kzt = 1 - RESTROOM ALTERATIONS IN BLDG. 'D' - SITE IMPROVEMENTs
- Status
- Closed
- Sector
- Commercial, Education, Government, Wind
- Location
- Lawndale, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mitchell ES Playground
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | THIS PROJECT CONSISTS OF: - DEMOLITION OF (E) PLAYGROUND EQUIPMENT & PLAYGROUND FLOORING MATERIAL - (N) PLAYGROUND - (N) PLAYGROUND EQUIPMENT - (N) 30' x 40' x 12'H SHADE STRUCTURE; RIDGE HEIGHT: 18' - SEISMIC DESIGN CATEGORY: D / Ss = 1.814, SDS = 2/3 Fa SS = 1.451 2.0 - WIND EXPOSURE CATEGORY: C / V = 101mph, Kzt = 1 - RESTROOM ALTERATIONS IN BLDG. 'D' - SITE IMPROVEMENTs |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lawndale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Government, Wind |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
