logo

Mitchell Hall Engineering Building at Virginia Tech

Sector: Chemical (Industrial) • Location: Blacksburg, Virginia, United States

Source: American School & University

Project
Under Construction

Mitchell Hall is a 285,500-square-foot academic and research facility at Virginia Tech in Blacksburg, Virginia. It will be the largest facility in Virginia Tech's College of Engineering, adding over 70% more space on the same site. The building includes classrooms, instructional laboratories, and research lab space for multiple engineering disciplines such as aerospace, ocean, chemical, mechanical

Status
Under Construction
Sector
Chemical (Industrial), Aerospace & Defense, Education, Wind, Manufacturing (Industrial), Tunnel, Steel, Commercial, Cement
Location
Blacksburg, Virginia, United States of America
Updated
22 Jul 2026
Source
American School & University

ConstructChat

Ask ConstructChat about Mitchell Hall Engineering Building at Virginia Tech

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Mitchell Hall Engineering Building at Virginia Tech” is an infrastructure initiative in the Chemical (Industrial) sector, located in Blacksburg, Virginia, United States. Taiyo aggregates data on it from American School & University.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mitchell Hall is a 285,500-square-foot academic and research facility at Virginia Tech in Blacksburg, Virginia. It will be the largest facility in Virginia Tech's College of Engineering, adding over 70% more space on the same site. The building includes classrooms, instructional laboratories, and research lab space for multiple engineering disciplines such as aerospace, ocean, chemical, mechanical engineering, computer science, and engineering education. The project also features an ADA-compliant pedestrian pathway and preserves a historic university-owned wind tunnel within the new building footprint. Construction has involved extensive concrete and steel work, with about 300,000 work hours contributed so far. Completion is targeted for winter 2028.

Original sector

Education

Location

Country

United States of America (USA)

State

Virginia

City

Blacksburg

Source

Source

American School & University

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Aerospace & Defense, Education, Wind, Manufacturing (Industrial), Tunnel, Steel, Commercial, Cement

Article published date

2026-07-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project