Mitla-Tehuantepec highway concession
Sector: Road • Location: Mexico
Source: InfraPPPWorld
The project includes the concession for the construction, operation, exploitation, maintenance, and expansion of the 169 km federal highway, of which 70 km had already been built, with the remaining 93 km to be built through a PPP model. The road includes three segments: Mitla-Entronque Tehuantepec II, Mitla-Santa Maria Albarradas, and Lachiguiri-Entronque Tehuantepec II.
- Status
- Closed
- Sector
- Road
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Mitla-Tehuantepec highway concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the concession for the construction, operation, exploitation, maintenance, and expansion of the 169 km federal highway, of which 70 km had already been built, with the remaining 93 km to be built through a PPP model. The road includes three segments: Mitla-Entronque Tehuantepec II, Mitla-Santa Maria Albarradas, and Lachiguiri-Entronque Tehuantepec II. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Mexico |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mexico
- Norte III Combined Cycle Power Plant Chihuahua
- Libramiento de Ciudad Obregon
- Autovia Urbana Norte
- Tuxtla Gutierrez - San Cristobal de las Casas Highway Expansion
- Coatzacoalcos-Villahermosa Highway
- Viaducto Bicentenario (Phase 1)
- La Piedad Bypass and Access to Mexico-Gudalajara Highway
- Rio de los Remedios-Ecatepec urban toll road (Phase I)
