logo
ProjectPre-Design

Miura Development Group - Mixed Use Building

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The proposed development consists of an 11-storey mixed-use building containing commercial and residential uses at-grade, and residential uses in its above-ground levels. The proposed concept provides vehicular parking in a surface parking area located along the south side of the building and below-grade in 3 underground levels. In total, approximately 316 vehicle parking spaces and 276 bicycle pa

Status
Prospective
Sector
Automotive, Residential, Commercial, Car parking, Manufacturing (Industrial)
Location
Burlington, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Miura Development Group - Mixed Use Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Miura Development Group - Mixed Use Building” is an infrastructure initiative in the Automotive sector, located in Burlington, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed development consists of an 11-storey mixed-use building containing commercial and residential uses at-grade, and residential uses in its above-ground levels. The proposed concept provides vehicular parking in a surface parking area located along the south side of the building and below-grade in 3 underground levels. In total, approximately 316 vehicle parking spaces and 276 bicycle parking spaces are provided. The proposed concept provides a total of 255 residential units, consis...

Budget

Location

Country

Canada

State

Ontario

City

Burlington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Automotive, Residential, Commercial, Car parking, Manufacturing (Industrial)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project