Mixed -Use Development- Parking Garage
Planning schematics · California · Last reported Mar 2025
Source: Dodge
consists of 80 dwelling units, 16 short-term stay residential units, 7,791 square feet of office space, and two levels of underground parking. Of the 80 dwelling units, 16 (i.e., 20 percent of the total units) are proposed to be reserved for affordable housing.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Hotel, Residential, Commercial, Car parking, Automotive
- Location
- La Cañada Flintridge, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed -Use Development- Parking Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | consists of 80 dwelling units, 16 short-term stay residential units, 7,791 square feet of office space, and two levels of underground parking. Of the 80 dwelling units, 16 (i.e., 20 percent of the total units) are proposed to be reserved for affordable housing. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | La Cañada Flintridge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Hotel, Residential, Commercial, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
