Ferrovial Business Lines Projects Mixed Arch “Monastery Bridge” on the M-50 in Dublin Dublin, Ireland video €102.01 M Total Budget 1550t Weight 62m Length As part of the expansion that our construction subsidiary Ferrovial Construction carried out on Dublin's M-50 beltway, the S04 structure is a mixed arch bridge located at the junction of the M-50 and the N-7 that connects Monastery Road and th

Project Information FAQ

Project Information

5 Q
The project “Mixed Arch “Monastery Bridge” on the M-50 in Dublin” is an infrastructure initiative in the Bridge sector, located in Dublin, Ireland. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Mixed Arch “Monastery Bridge” on the M-50 in Dublin Dublin, Ireland video €102.01 M Total Budget 1550t Weight 62m Length As part of the expansion that our construction subsidiary Ferrovial Construction carried out on Dublin's M-50 beltway, the S04 structure is a mixed arch bridge located at the junction of the M-50 and the N-7 that connects Monastery Road and the lightrail tram station by crossing the N-7. The 62-meter-long bridge consists of two parallel vertical arches 15 m high that are unbraced and separated by 14 m between axes. The arches are formed by steel tubes with an almost rectangular cross-section and filled with self-compacting concrete. The deck is 20 m wide, which allows for two lanes of vehicular traffic and two bicycle lanes, in addition to two cantilever sidewalks along the outside of the arches. The structural section is composed of two longitudinal box girders made of steel braced by transverse double-T beams. The deck slab is made of reinforced concrete 25 cm thick. The deck is connected to the arches on the spring lines by means of 8 pairs of suspension cables made of locked coil cable 63 mm in diameter. The main condition for executing this structure comes from the need to not affect existing traffic, along with the little space available. As such, manufacturing began on the metallic structure in a workshop, while work was done on the foundation, the abuttment, and the preparation of auxiliary launch pieces at the construction site. Assembly was done on-site on a platform adjacent to the southern abuttment, where there are two slabs where slide rails are located. Launching the entire bridge, with its 1,550 tons of weight, to the final site was carried out with special trucks located at the far front end and sliding devices at the other end. The nighttime operation was done while interrupting traffic for only 3 hours.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data