Mixed Arch “Monastery Bridge” on the M-50 in Dublin
Sector: Bridge • Location: Dublin, Ireland
Source: Ferrovial
Ferrovial Business Lines Projects Mixed Arch “Monastery Bridge” on the M-50 in Dublin Dublin, Ireland video €102.01 M Total Budget 1550t Weight 62m Length As part of the expansion that our construction subsidiary Ferrovial Construction carried out on Dublin's M-50 beltway, the S04 structure is a mixed arch bridge located at the junction of the M-50 and the N-7 that connects Monastery Road and th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects Mixed Arch “Monastery Bridge” on the M-50 in Dublin Dublin, Ireland video €102.01 M Total Budget 1550t Weight 62m Length As part of the expansion that our construction subsidiary Ferrovial Construction carried out on Dublin's M-50 beltway, the S04 structure is a mixed arch bridge located at the junction of the M-50 and the N-7 that connects Monastery Road and the lightrail tram station by crossing the N-7. The 62-meter-long bridge consists of two parallel vertical arches 15 m high that are unbraced and separated by 14 m between axes. The arches are formed by steel tubes with an almost rectangular cross-section and filled with self-compacting concrete. The deck is 20 m wide, which allows for two lanes of vehicular traffic and two bicycle lanes, in addition to two cantilever sidewalks along the outside of the arches. The structural section is composed of two longitudinal box girders made of steel braced by transverse double-T beams. The deck slab is made of reinforced concrete 25 cm thick. The deck is connected to the arches on the spring lines by means of 8 pairs of suspension cables made of locked coil cable 63 mm in diameter. The main condition for executing this structure comes from the need to not affect existing traffic, along with the little space available. As such, manufacturing began on the metallic structure in a workshop, while work was done on the foundation, the abuttment, and the preparation of auxiliary launch pieces at the construction site. Assembly was done on-site on a platform adjacent to the southern abuttment, where there are two slabs where slide rails are located. Launching the entire bridge, with its 1,550 tons of weight, to the final site was carried out with special trucks located at the far front end and sliding devices at the other end. The nighttime operation was done while interrupting traffic for only 3 hours. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
