Mixed Use Building (Alteration)
Sector: Power Generation (CCGT) • Location: New York, United States of America
Source: Dodge
Renovation of apartment including removal and installation of non bearing partitions and related finishes, and new thought wall opening at secondary facade over inner courtyard, as per plans filed herewith. No change to use, egress or occupancy. Modification to existing plumbing fixtures as per plans filed herewith. No change to use, egress of occupancy. Installation of thru wall condensing unit a
- Status
- Prospective
- Sector
- Power Generation (CCGT), Residential, Commercial, Manufacturing (Industrial)
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovation of apartment including removal and installation of non bearing partitions and related finishes, and new thought wall opening at secondary facade over inner courtyard, as per plans filed herewith. No change to use, egress or occupancy. Modification to existing plumbing fixtures as per plans filed herewith. No change to use, egress of occupancy. Installation of thru wall condensing unit and air handler, electric floor heating and new grilles as per plans filed herewith. No change to ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
