Mixed Use Building (Alteration)
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge
New FDNY pump room at the cellar level. DEMOLITION OF ROOF TANKS, INSTALLATION OF NEW SPRINKLER BOOSTER PUMP SYSTEM, AND MODIFICATION TO EXISTING AUTOMATIC SPRINKLER SYSTEM. INTALLATION OF NEW 6" FIRE SERVICE, NEW DCDA, AND NEW 3" RPX.
- Status
- Prospective
- Sector
- Commercial, Residential, Manufacturing (Industrial)
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | New FDNY pump room at the cellar level. DEMOLITION OF ROOF TANKS, INSTALLATION OF NEW SPRINKLER BOOSTER PUMP SYSTEM, AND MODIFICATION TO EXISTING AUTOMATIC SPRINKLER SYSTEM. INTALLATION OF NEW 6" FIRE SERVICE, NEW DCDA, AND NEW 3" RPX. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
