Mixed Use Building (Alteration)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
RESOLVE ECB VIOLATION: 39146241X AND 39146239R; RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN.REPLACE GLASS STOREFRONT AND ROLLING GATE AS P.RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | RESOLVE ECB VIOLATION: 39146241X AND 39146239R; RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN.REPLACE GLASS STOREFRONT AND ROLLING GATE AS P.RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
