Mixed Use Building (Alteration)
Planning schematics · New York · Last reported Oct 2024
Source: Dodge USA
WORK TO APT. 1D AT THE 2FL, APT. 2C, 2D AND 2E AT THE 3FL, APT. 3C AT THE 4FL, AND APT. 5A AND 5E AT THE 6FL OF AN EXISTING 6-STORY,MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY.
- Status
- Prospective
- Sector
- Residential, Manufacturing (Industrial), Commercial
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | WORK TO APT. 1D AT THE 2FL, APT. 2C, 2D AND 2E AT THE 3FL, APT. 3C AT THE 4FL, AND APT. 5A AND 5E AT THE 6FL OF AN EXISTING 6-STORY,MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
