Mixed Use Building (Alteration)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
COMBINE APT# 22 & A3 AT 2ND FLOOR AND APT# 22 AT 3RD FLOOR IN EXISTING 4 STORIES MIXED-USE BUILDING. - PLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION # B01263077
- Status
- Prospective
- Sector
- Residential, Manufacturing (Industrial), Commercial
- Location
- Bedford-Stuyvesant, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | COMBINE APT# 22 & A3 AT 2ND FLOOR AND APT# 22 AT 3RD FLOOR IN EXISTING 4 STORIES MIXED-USE BUILDING. - PLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION # B01263077 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Bedford-Stuyvesant |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
