Mixed Use Building (Alteration)
Sector: Road • Location: New York, United States of America
Source: Dodge
THE SCOPE OF WORK INCLUDES INTERIOR RENOVATION OF RETAIL SPACE ON THE GROUND FLOOR, INCLUDING CELLAR ON MERCER STREET. WORK INCLUDES INTERIOR PARTITIONS, FLOOR, AND RESTROOM ALTERATIONS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY - THE SCOPE OF WORK INCLUDES INTERIOR RENOVATION OF RETAIL SPACE ON THE GROUND FLOOR, INCLUDING CELLAR ON MERCER STREET. WORK INCLUDES INTERIOR PARTITIO
- Status
- Prospective
- Sector
- Road, Residential, Manufacturing (Industrial), Commercial
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | THE SCOPE OF WORK INCLUDES INTERIOR RENOVATION OF RETAIL SPACE ON THE GROUND FLOOR, INCLUDING CELLAR ON MERCER STREET. WORK INCLUDES INTERIOR PARTITIONS, FLOOR, AND RESTROOM ALTERATIONS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY - THE SCOPE OF WORK INCLUDES INTERIOR RENOVATION OF RETAIL SPACE ON THE GROUND FLOOR, INCLUDING CELLAR ON MERCER STREET. WORK INCLUDES INTERIOR PARTITIONS, FLOOR, AND RESTROOM ALTERATIONS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
