Mixed Use Building (Alteration)
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge
Alt. CO addition to existing apt. unit to include GC, demo to interior and exterior partitions with installation of new structural steel, non load bearing partitions, windows, doors, flooring, millwork and finishes. no change to use, egress and occupancy.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial, Steel, Metal
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Alt. CO addition to existing apt. unit to include GC, demo to interior and exterior partitions with installation of new structural steel, non load bearing partitions, windows, doors, flooring, millwork and finishes. no change to use, egress and occupancy. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial, Steel, Metal |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
