Mixed Use Building (Alteration)
Sector: Residential • Location: New York, United States of America
Source: Dodge
GENERAL CONSTRUCTION ARCHITECTURAL RENOVATION OF THE EXISTING APARTMENT 65B ON THE 65TH LABELED FLOOR (44TH CONSTRUCTION FLOOR PER CO). AS PER PLANS FILED. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY. - PLUMBING WITH THE RENOVATION OF THE EXISTING APARTMENT 65B ON THE 65TH LABELED FLOOR (44TH CONSTRUCTION FLOOR PER CO). AS PER PLANS FILED. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY.
- Status
- Prospective
- Sector
- Residential, Manufacturing (Industrial), Commercial
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | GENERAL CONSTRUCTION ARCHITECTURAL RENOVATION OF THE EXISTING APARTMENT 65B ON THE 65TH LABELED FLOOR (44TH CONSTRUCTION FLOOR PER CO). AS PER PLANS FILED. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY. - PLUMBING WITH THE RENOVATION OF THE EXISTING APARTMENT 65B ON THE 65TH LABELED FLOOR (44TH CONSTRUCTION FLOOR PER CO). AS PER PLANS FILED. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
