Mixed Use Building Floor 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
INTERIOR RENOVATION OF AN APARTMENT. RENOVATION WILL INCLUDE MODIFICATIONS TO INTERIOR LAYOUT, FINISHES, AND MILLWORK. WORK WILL INCLUDE MINOR ELECTRICAL WORK AND REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. Square feet 1190
- Status
- Prospective
- Sector
- Car parking, Power Generation (CCGT), Commercial, Automotive, Residential, Manufacturing (Industrial)
- Location
- Park Slope, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building Floor 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | INTERIOR RENOVATION OF AN APARTMENT. RENOVATION WILL INCLUDE MODIFICATIONS TO INTERIOR LAYOUT, FINISHES, AND MILLWORK. WORK WILL INCLUDE MINOR ELECTRICAL WORK AND REPLACEMENT OF EXISTING PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. Square feet 1190 |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Park Slope |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Generation (CCGT), Commercial, Automotive, Residential, Manufacturing (Industrial) |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
