Mixed Use Building Floor 7
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
General Construction including minor removal of partitions, cabinetry and flooring. New partition, dropped ceilings cabinetry and finishes as per plans filed. No change to Use, Occupany or Egress Square Feet : 1300
- Status
- Prospective
- Sector
- Residential, Commercial, Manufacturing (Industrial)
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed Use Building Floor 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | General Construction including minor removal of partitions, cabinetry and flooring. New partition, dropped ceilings cabinetry and finishes as per plans filed. No change to Use, Occupany or Egress Square Feet : 1300 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
