Mixed Use Building Remodel
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge
( Oakvale Homes &Amp; Development ) Level Iii Alterations To Remodel ( 2 ) Existing Tenant Spaces On The 1St Floor And ( 2 ) Existing Dwelling Units On The 2Nd Floor Of A 2-Story Commercial Mixed Use Building. *** Digeplan Attached Asbestos Survey Attached Asbestos Clearance Letter ***&Nbsp; &Nbsp;
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Buffalo, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mixed Use Building Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | ( Oakvale Homes &Amp; Development ) Level Iii Alterations To Remodel ( 2 ) Existing Tenant Spaces On The 1St Floor And ( 2 ) Existing Dwelling Units On The 2Nd Floor Of A 2-Story Commercial Mixed Use Building. *** Digeplan ***&Nbsp;&Nbsp; &Nbsp;*** Attached Asbestos Survey ***&Nbsp; &Nbsp;*** Attached Asbestos Clearance Letter ***&Nbsp; &Nbsp; |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Buffalo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
