Mixed Use Building
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Dodge USA
Project Title: First Time Tenant Build-Out For A New Restaurant Within An Existing Multi-Story Mix-Use Building. Remodel Of First Floor Tenant Space. All Mechanical, Electrical And Plumbing, Minor Structural Scope And Minor Exterior Updates Total Square Feet: 3525
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Education, Consumer Products
- Location
- Ann Arbor, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed Use Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project Title: First Time Tenant Build-Out For A New Restaurant Within An Existing Multi-Story Mix-Use Building. Remodel Of First Floor Tenant Space. All Mechanical, Electrical And Plumbing, Minor Structural Scope And Minor Exterior Updates Total Square Feet: 3525 |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Ann Arbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Education, Consumer Products |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
