Mixed Use Building
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: Dodge USA
Renovations - Interior Nsc South Station Project_ Amend Permit Ert611289 For Fit-Up Of Conference And Circulation Space On Floor 9 And Fit Out On Floor 11 In The South Station Tower. The Project Consists Of Conference Rooms And Bathrooms Fit Out, Elevator Lobby Finishes Upgrade, Public Circulation Space Upgrade, Support Rooms Fit O-----Fit Out* Application Assigned To Fd On 2.29.24 By P.W.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Residential
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed Use Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Renovations - Interior Nsc South Station Project_ Amend Permit Ert611289 For Fit-Up Of Conference And Circulation Space On Floor 9 And Fit Out On Floor 11 In The South Station Tower. The Project Consists Of Conference Rooms And Bathrooms Fit Out, Elevator Lobby Finishes Upgrade, Public Circulation Space Upgrade, Support Rooms Fit O-----Fit Out* Application Assigned To Fd On 2.29.24 By P.W. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
