Mixed Use Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
INTERIOR ALTERATION OF AN EXISTING RETAIL SPACE. THIS SCOPE OF WORK INCLUDES MINOR PARTITIONS, FIXTURES AND FINISHES. NEW LIGHTING AND POWER. NO EXTERIOR STOREFRONT WORK, EXISTING TO REMAIN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Square Feet 502
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed Use Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | INTERIOR ALTERATION OF AN EXISTING RETAIL SPACE. THIS SCOPE OF WORK INCLUDES MINOR PARTITIONS, FIXTURES AND FINISHES. NEW LIGHTING AND POWER. NO EXTERIOR STOREFRONT WORK, EXISTING TO REMAIN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Square Feet 502 |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
