Mixed-use Condominiums and Restaurant
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
A developer s variance request for a proposed five-story condominium building with a restaurant on Kirkwood Avenue - The 67,000-square-foot building is proposed by developer Clearpath Services. It would replace a parking lot west of the CVS Pharmacy on the corner of Kirkwood and Washington Street - he building is planned to be 70.5 feet tall. It will include 14 condos - The building also would con
- Status
- Prospective
- Sector
- Car parking, Residential, Commercial, Road, Consumer Products, Automotive, Manufacturing (Industrial)
- Location
- Bloomington, Indiana, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mixed-use Condominiums and Restaurant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A developer s variance request for a proposed five-story condominium building with a restaurant on Kirkwood Avenue - The 67,000-square-foot building is proposed by developer Clearpath Services. It would replace a parking lot west of the CVS Pharmacy on the corner of Kirkwood and Washington Street - he building is planned to be 70.5 feet tall. It will include 14 condos - The building also would contain basement-level parking for residents, and some ground-level spaces for restaurant patrons |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Bloomington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Residential, Commercial, Road, Consumer Products, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
